29th Jan 2010 U T X 5 Stratford
A special place
[January 2010] brings us back to that special place in east london
U T X 5,instllation of three 640mm steel sleeves 70metres each, using our guided auger one pass system.we are currently having the 20mm plates rolled in to 640mm tubes and welded,for an early March start